User:Bwgardner: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 48: | Line 48: | ||
|- | |- | ||
| Bridge Name: Test Bridge | | Bridge Name: Test Bridge | ||
| Bridge Construction Material: | | Bridge Construction Material: | ||
| Construction Material Code: | | Construction Material Code: | ||
| Year of Last Restoration: | | Year of Last Restoration: | ||
|- | |- | ||
Line 58: | Line 61: | ||
|- | |- | ||
| This is a test introduction | | This is a test introduction | ||
|- | |- | ||
|} | |} | ||
Line 71: | Line 68: | ||
|- | |- | ||
| Canal Crossed: Test Canal | | Canal Crossed: Test Canal | ||
| Segment Crossed: TEST2 | | Segment Crossed: TEST2 | ||
| Width of Canal: T12 | | Width of Canal: T12 | ||
|- | |- | ||
Line 80: | Line 79: | ||
|- | |- | ||
| Northern District: | | Northern District: | ||
| Northern Island Number: | | Northern Island Number: | ||
| Southern District: | | Southern District: | ||
| Southern Island Number: | | Southern Island Number: | ||
|- | |- | ||
Line 90: | Line 92: | ||
|- | |- | ||
| Arch Style: | | Arch Style: | ||
| Arch Code: | | Arch Code: | ||
|- | |- | ||
Line 98: | Line 101: | ||
|- | |- | ||
| Number of Ramps: | | Number of Ramps: | ||
| Steps North Side: | | Steps North Side: | ||
| Steps South Side: | | Steps South Side: | ||
| Minimum Width of Steps: | | Minimum Width of Steps: | ||
| Step Material: | | Step Material: | ||
| Extra Handrail: | | Extra Handrail: | ||
|- | |- | ||
Line 110: | Line 118: | ||
|- | |- | ||
| Width of Summit: | | Width of Summit: | ||
| Length of Summit: | | Length of Summit: | ||
| Summit Construction Material: | | Summit Construction Material: | ||
| Construction Material Code: | | Construction Material Code: | ||
| Pavement Material of Summit: | | Pavement Material of Summit: | ||
|} | |} | ||
Line 120: | Line 132: | ||
|- | |- | ||
| Latitude: | | Latitude: | ||
| Longitude: | | Longitude: | ||
|- | |- |
Revision as of 12:04, 15 November 2013
Test Text | |
---|---|
Basic Information | |
Bridge Code | TEST1 |
Zucchetta Number | T12 |
Canal Crossed | Test Canal |
Handicapped Accessible | TEST |
Length (m) | T12 |
Width(m) | T12 |
Year Constructed | T1234 |
Latitude | T12 |
Longitude | T34 |
Private | TEST |
T12 |
Overview of Bridge
Bridge Name: Test Bridge | Bridge Construction Material: | Construction Material Code: | Year of Last Restoration: |
Introduction
This is a test introduction |
Canal
Canal Crossed: Test Canal | Segment Crossed: TEST2 | Width of Canal: T12 |
Districts
Northern District: | Northern Island Number: | Southern District: | Southern Island Number: |
Arch
Arch Style: | Arch Code: |
Ramps
Number of Ramps: | Steps North Side: | Steps South Side: | Minimum Width of Steps: | Step Material: | Extra Handrail: |
Summit
Width of Summit: | Length of Summit: | Summit Construction Material: | Construction Material Code: | Pavement Material of Summit: |
Location
Latitude: | Longitude: |
Link to Data
Link: |
Map
|